Certified Payroll for Google Sheets: Setup Guide
By Quietwork Labs·
Five steps, about 10 minutes. Do it on a computer, with your purchase email open.
Step 1: Make your copy
Open the copy link in your purchase email and click Make a copy. The copy, and the script inside it, belong to your Google account. If Google asks you to request access instead, you've opened our original: go back to the email and use the copy link.

Step 2: Add your license key
On the Settings tab (1), paste the key from your email (it starts with QW-CP-) next to License key (2). Trying the free copy? Leave it blank: you get your first project, with PDFs marked SAMPLE. Then swap the example business name, address, certifying official and contact details for yours: they're printed on every form.

Step 3: Open the menu
The Certified Payroll menu (1) appears at the end of the menu bar a few seconds after the sheet opens. Choose Create WH-347… (2). No menu after 10 seconds? Reload the page once: a brand-new copy sometimes needs it.

Step 4: Allow access, once
The first time only, Google asks you to approve the script in your copy. It takes three screens. First, click OK, then pick your Google account if asked:

Then Advanced (1) and Go to Certified Payroll for Google Sheets (unsafe) (2). It's safe: the "developer" Google names is you, because the copy is yours.

Then tick Select all (1), scroll down and click Continue (2). All four are needed: without them the form can't be checked or saved to your Drive.

Step 5: Create the PDF
Your copy comes with a fictional example payroll, so you can try it right away. Pick the project and week (1), press Check (2) to see the totals and anything flagged, then Create PDF (3). Check never creates anything; Create PDF checks again first and stops if there's an error. The PDF is saved in Google Drive, in a folder called Certified Payroll (WH-347).

That's it, you're set up.
Next, replace the example rows with your own. Everything below is there when you need it.
Replace the example with your own+
Fill these in once per project or worker. They don't change week to week.
| Tab | One row per | Notes |
|---|---|---|
| Projects | Covered project | Project or contract number, the full location (or county and state), every wage determination and modification number, and whether you're the prime or a sub. Set Active to Finished to hide it. |
| Rates | Project and classification | The basic hourly rate and fringe rate from the wage determination. These are what pay is checked against. |
| Workers | Worker | ID (last 4 of the SSN, never the full number), name, J or RA, and for apprentices the level, program and OA or SAA. Straight-time and overtime rates (overtime left blank = 1.5 × straight time), cash in lieu of fringe per hour, and the hourly credit for each fringe plan. |
| Fringe Plans | Plan (up to 6) | Plan name, type, plan number, and funded or unfunded. Plan 1 to 6 match the credit columns on Workers. |
Then delete the example rows, the test PDF and its row on the WH-347 Log tab.
Every week+
- Time tab: one row per worker, project and classification with the week ending date and daily hours. D1 is the first day of your workweek and D7 is the week ending date. Straight time goes in ST D1–D7, overtime in OT D1–D7. A worker in two classifications gets two rows. Fill in the rate columns only when that row was paid differently from the worker's usual rate.
- Pay tab: one row per worker with tax withholding, FICA, other deductions and a description of any other deduction. Fill in Gross for all work when the worker also earned money on other jobs that week, and Net paid if it differs from gross minus deductions.
- Create the form: Certified Payroll › Create WH-347…, pick the project and week, tick Final payroll on your last week, and press Check. Fix any errors in the tabs and check again, then press Create PDF.
- Sign and submit: sign page 2 by hand or with a legally valid electronic signature (not a scanned one) and send it to whoever your contract names.
No work on a project this week, but your agency still wants a payroll? Tick No work performed. The form gets the header, the next payroll number, "NO WORK PERFORMED" across the empty worker rows, and "No work performed on this project during this week." in the remarks.
What the check looks at+
Errors stop the PDF: rate + fringe credit + cash in lieu below the wage determination's basic + fringe; a full Social Security number; a registered apprentice without a program or OA/SAA; missing names, IDs, classifications or rates; daily hours outside 0–24; deductions larger than gross; gross for all work lower than gross on this project.
Warnings don't: overtime below the rate owed, a cash rate below the basic rate that fringe makes up for (allowed, but overtime is still figured on the basic rate), over 40 hours with no overtime, apprentice rates to check against the program, net pay that isn't gross minus deductions, and an other deduction with no description. See the WH-347 guide for what each column means.
What each Google permission is for+
| Google asks to | Why |
|---|---|
| See, edit, create, and delete only the specific Google Drive files you use with this app | Create the PDF folders and save PDFs. It can't see your other Drive files. |
| View and manage spreadsheets that this application has been installed in | Read your tabs and add rows to the WH-347 Log. Your copy only. |
| Connect to an external service | Send the selected project-week to quietworklabs.com, which checks it and fills in the PDF. It isn't stored. Your license key is checked at the same time. |
| Display and run third-party web content in prompts and sidebars inside Google applications | The Create WH-347 window. |
Frequently asked questions
The Certified Payroll menu doesn't appear.+
It shows up at the end of the menu bar a few seconds after the sheet opens; on a brand-new copy it sometimes needs one reload of the page. Still missing? Check the title: your copy starts with “Copy of”. The original from the email is view-only and has no menu.
Google asks me to request access to the sheet.+
You've opened our original, which is view-only for everyone. Open the copy link from your purchase email and choose Make a copy. Your copy is yours to edit, with the script inside it, and nobody needs to grant you access.
Google says “Google hasn’t verified this app”. Is that safe?+
Yes. The script lives in your own copy, so the “developer” Google names on that screen is your own email address. Google shows the warning for any script that hasn't been through its app review, which a script in your own copy never has. Click Advanced, then Go to Certified Payroll for Google Sheets (unsafe). On Google Workspace accounts the screen often doesn't appear.
It says “Access blocked” or “This app is blocked”.+
Your Google Workspace admin restricts apps. Ask them to open Admin console › Security › Access and data control › API controls and tick “Trust internal, domain-owned apps”, or allow this app. Your copy counts as an internal app because someone in your company owns it.
I didn't tick every box on Google's permission screen.+
Then the form can't be checked or saved. Choose Certified Payroll › Create WH-347… again: Google asks again for whatever is missing. Tick Select all, then Continue.
The payroll number is wrong.+
The number comes from the WH-347 Log tab: the same number again if that project and week is already logged, otherwise one more than the highest number for the project. Switching from another system mid-project? Add a row to the log with your last payroll number and week, and the next form continues from there.
A worker shows up as “isn't on the Workers tab”.+
The Worker ID on the Time row has to match the Workers tab. IDs are compared as text, so 0123 and 123 both match a worker whose ID is 0123.
It says there's no wage determination rate for a classification.+
Add a row on the Rates tab with the project name and the classification spelled as on the Time row, with the basic hourly and fringe rates from the wage determination. Without it the form can still be created, but pay isn't checked for that classification.
Where are my PDFs?+
In Google Drive, in the folder Certified Payroll (WH-347), with a subfolder per project. Each PDF is also linked from the WH-347 Log. Create the same week again and you get a new PDF; the old one stays.
How do I remove its access?+
Go to myaccount.google.com/connections and remove the app. Your sheet, its data and your PDFs stay where they are.